National Trust Wimpole Home Farm - The Heavy Horse Project
Place:
National Trust Wimpole Home Farm
Type:
Commercial
Year:
2019
Status:
Built
The Home Farm at the Wimpole Estate, owned and managed by the National Trust. One of the most important examples of the Soan’s farm layout that survives today as a working farm that has earned it Grade 2 listing.
The project was the complete refurbishment of the Heavy Horse Stables housed in the magnificent thatched stables.
Working closely with the head horseperson, we carried out the following services:
- Lead Designer, including coordination of the design team.
- Building Inspection for defect analysis.
- Design of the new layout, including new external gates and fencing.
- Submission of Statutory Consents and obtaining approval of Listed Building Consent and Planning Approval.
- Principal Designer role under the Construction (Design and Management) Regulations 2015 (CDM).
- Preparation of Building Regulation drawings and obtaining approval from the Local Authority Building Control.
- Preparation of the technical design, including production of construction drawings.
- Production of a full Specification of Works using NBS software and the CAWS classification system.
- Invitation to Tender, Tender action, and Tender Analysis with recommendations for the award of contract.
- Contract Administration, administering the industry-standard Intermediate Contract from the JCT suite of building contracts.
- Valuations.
- Payment Certificates.
- Variations.
- Computation of the final account.
- Issuing the Final Certificate and making good defects certificate following the 12-month Rectification period.
- Weekly site visits during the contract period and reporting back to the client.
The project has been a success story due to the efforts and engagement of the client team throughout the project, the contractor, Groupbridge, and us working in a collaborative approach.